Industrial

Energy from Waste, Derby

Architecture
BIM

Collaborative BIM Level 2 project with GHD Livigunn to deliver EfW facility to sustainably power 14,000 homes in Derby.

Our expertise in both BIM and Energy projects saw our appointment by GHD to collaboratively deliver a 200,000 tonnes per annum Mechanical Biological Treatment (MBT) and gasification facility at Sinfin Lane, Derby. The design for the project utilised a 3D BIM model to fully co-ordinate and integrate all architectural, structural, M&E elements including fire detection and protection, noise control, and the integration of the process designs for bio-oxidation, mechanical pre-treatment and gasification plant.

Explore