Industrial

North Killinghome, Gasification facility

Architecture
Masterplanning

Sensitive and considered design mitigates the impact of significant power station.

Collaborating with LDA Design on the design of a Integrated Gasification Combined Cycle facility to assist its passage through the Nationally Significant Infrastructure Project process. Our work centred on master planning the site to provide a 470MW power station with carbon capture whilst mitigating the appearance from sensitive view points to create a legible and deliverable design.

Explore